Decisions and opinions of the Agency on the certification of the transmission system operator

YUGOROSGAZ TRANSPORT

Date

Document

12.12.2016.

Decision on Issuance of Certificate to „Yugorosgaz-transport“, LLC, Niš as to Independent System Operator

22.04.2017.

Opinion of Energy Community Secretariat 2/17 on Agency’s Decision on Certification of „Yugorosgaz-transport“, LLC, Niš

20.06.2017.

Final Decision on Issuance of Certificate to „Yugorosgaz-transport“, LLC, Niš as to Independent System Operator (Serbian version)

15.07.2019.

Decision on Revocation of Certificate to „Yugorosgaz-transport“, LLC, Niš as to Independent System Operator


TRANSPORTGAS SRBIJA

Date

Document

21.11.2025.

Opinion of Energy Community Secretariat 3/24 on Agency’s Decision on Certification of TRANSPORTGAS SRBIJA d.o.o. Novi Sad

21.03.2025.

Final Decision on Issuance of Certificate to TRANSPORTGAS SRBIJA d.o.o. Novi Sad as to Independent System Operator


ELEKTROMREŽA SRBIJE (PE EMS)

Date

Document

26.01.2017.

Decision on Issuance of Certificate to PE EMS as to Transmission System Operator

15.06.2017.

Opinion of Energy Community Secretariat 3/17 on the Decision of the Energy Agency on PE EMS Certification

04.08.2017.

Final Decision on Issuance of Certificate to PE EMS as to Transmission System Operator (Serbian version)


GASTRANS


Date

Document

21.02.2020.

Decision on Issuance of Certificate to GASTRANS as to Independent Transmission Operator

31.03.2022.

Decision on Confirmation of Compliance with Conditions (Serbian version)

News
AERS: Joint Natural Gas Transmission Tariffs

Belgrade, July 11, 2025

On the session held on July 11, 2025, the Council of the Energy Agency of the Republic of Serbia has adopted a Decision on Joint Natural Gas Transmission Tariffs. In accordance with the Methodology for Setting Natural Gas Transmission Tariffs, this decision establishes joint natural gas transmission tariffs considered as a whole, which are applied by “Transportgas Srbija” d.o.o. Novi Sad and “Yugorosgaz-Transport” d.o.o. Niš during the first regulatory period lasting three gas years — from October 1, 2025, to September 30, 2028.


Approval of the Natural Gas Distribution System Development Plan of the Distribution System Operator “GAS” d.o.o. Bečej

Belgrade, July 11, 2025

On the session held on July 11, 2025, the Council of the Energy Agency of the Republic of Serbia has adopted a decision granting approval to the Distribution System Development Plan for the period 2025–2029, along with the Investment Plan for the period 2025–2027, submitted to the Agency by the natural gas distribution system operator “GAS” d.o.o. Bečej.


PUBLIC CONSULTATION: Draft Transmission System Development Plan of the Republic of Serbia for the Period 2025–2034

Belgrade,  June 19, 2025

On June 19, 2025, the Energy Agency of the Republic of Serbia has launched a public consultation on the Draft Transmission System Development Plan of the Republic of Serbia for the period 2025–2034, submitted to the Agency by the transmission system operator “Elektromreža Srbije” a.d.


Approvals of Operational Limitations for Facilities Connecting to the Transmission System

Belgrade, June 19, 2025

On the session held on June 19, 2025, upon the request of the Joint Stock Company "Elektromreža Srbije", the transmission system operator, the Council of the Energy Agency of the Republic of Serbia has adopted decisions approving operational limitations for battery energy storage systems and generation facilities connecting to the transmission system.

According to the Energy Law, the transmission system operator may offer a connection subject to operational limitations, provided such limitation is approved by the Agency.



Approval of the Distribution System Development Plan of “YUGOROSGAZ AD BEOGRAD”

Belgrade, June 5, 2025

On the session held on June 5, 2025, the Council of the Energy Agency of the Republic of Serbia has adopted a decision to grant approval of the Distribution System Development Plan for the period 2025–2029, along with the Investment Plan for the period 2025–2027, which was submitted to the Agency by the natural gas distribution system operator “YUGOROSGAZ AD BEOGRAD.”


Instructions for working with clients