Српски
 Expand/Contract





16th Energy Investment and Regulation Conference
September 25-26, 2017, Astana, Kazakhstan

   Home

LICENCES

Submission of application

An application for energy licence the issuance of which is under the jurisdiction of the Energy Agency of the Republic of Serbia is submitted by filling the General Form (Општи образац) ОО1 as well as the Special Form (Посебан образац) ПО depending on the type of energy activity for which the licence is to be issued. The defined documents are attached to the application form as well as the evidence on the payment of the republic administration fee.

I.

The General Form - ОО1 as well as the Special Form - ПО represent the constituent part of the Rulebook on Licence for Carrying out Energy Activities and Certification („Official Gazette of RS“, No. 87/15).

The licence applicants are obliged to list the given data fully and with accuracy as it is defined in the General Form - ОО1 and in the Special Form – ПО which can be downloaded by clicking on the following links (all the documents are in MS Word 2003 format):

General Form - ОО1 - Application for Issuance of Licence for Carrying out Energy Licence (the applicant fills in the data from chapter I-IV)

Special Form – (ПО) for energy activities:
(unless energy licence is to be issued for energy activities marked under items 6, 7, 8, 12 and 13)
  1. Electricity production
  2. Combined power and heat production (Form ПО 2.1 и Form ПО 2.2)
  3. Electricity transmission and transmission system operation
  4. Electricity distribution and distribution system operation
  5. Electricity distribution and closed distribution system operation
  6. Electricity supply
  7. Wholesale electricity supply
  8. Organised electricity market operation
  9. Natural gas transmission and transmission system operation (Form ПО 6)
  10. Natural gas storage and storage operation (Form ПО 7)
  11. Natural gas distribution and distribution system operation (Form ПО 8)
  12. Natural gas supply
  13. Natural gas public supply
  14. Oil derivatives production (Form ПО 9)
  15. Oil transport via oil pipelines (Form ПО 10)
  16. Oil derivatives transport via product pipelines (Form ПО 11)
  17. Oil, oil derivatives and biofuels storage (Form ПО 12)
  18. Oil, oil derivatives, biofuels and compressed natural gas trade (Form ПО 13)
  19. Trade in fuels outside petrol stations (Form ПО 14)
  20. Filling reservoirs for liquid petroleum gas, compressed and liquefied natural gas (Form ПО 15)
  21. Trade in motor fuels and other fuels on petrol stations (Form ПО 16)
  22. Trade in fuels for watercrafts (Form ПО 17)
  23. Biofuels production (Form ПО 20)
  24. Bioliquids production (Form ПО 21)
  25. Blending biofuels with fuels of oil origin (Form ПО 22)
II.

With the General Form ОО1 and the relevant Special Form (ПО), the applicant also submits the evidences on compliance with requirements for licence issuance which are prescribed by Art. 22 and 25 of the Energy Law and Art. 12-15 of the Rulebook.

III.

The applicant is also obliged to submit a proof of payment of republic administrative fee to the Agency.


WHAT'S NEW
20.6.2017 - АЕRS: Approval of Metering Equipment Transfer on the Distribution System EPS Distribucija ... >> Details
20.6.2017 - AERS: Approval of Yugorosgaz-Transport Transmission System Development Plan ... >> Details
20.6.2017 - АЕRS: Independent Transmission System Operator Certificate to Yugorosgaz-transport, LLC ... >> Details
1.6.2017 - AERS Submitted 2016 Report to the National Assembly ... >> Details
1.6.2017 - Reports on Necessity of Electricity Price Regulation Adopted ... >> Details
28.4.2017 - Lower Natural Gas Transmission Use-of-System Charges via Yugorosgas-Transport, LLC network ... >> Details
31.3.2017 - PUBLIC CONSULTATION: Transmission System Development Plan of the Republic of Serbia for 2017-2026 ... >> Details
10.2.2017 - Amendments to Rules on Supplier Switching ... >> Details
26.1.2017 - АЕRS: Certificate to EMS JSC as Electricity Transmission System Operator ... >> Details
29.12.2016 - Instructions on Method and Procedure of Approval of Legal Acts Approved by AERS ... >> Details
29.12.2016 - Adopted Decisions in Electricity and Natural Gas Sectors ... >> Details
12.12.2016 - Public Consultations: YUGOROSGAZ-TRANSPORT LLC Transmission System Development Plan for Period 2017 – 2026 ... >> Details
12.12.2016 - АЕRS: “Yugorosgaz-transport“ Awarded with Independent Natural Gas System Operator Certificate ... >> Details
9.12.2016 - AERS Council: Approval of EMS Rules on Publication of Key Market Data ... >> Details
9.12.2016 - Approval of Electricity Market Rules ... >> Details
9.12.2016 - Approval of Agreements on Cross-Border Capacity Allocation ... >> Details
18.11.2016 - Public Consultations: Methodology for Setting Natural Gas Distribution Use-of-System Charge ... >> Details
31.8.2016 - Agency Approves New Electricity Prices ... >> Details
28.7.2016 - Final Customer’s Right to Access to Data on Electricity and Natural Gas Self-Consumption ... >> Details
18.7.2016 - Approval of Decision on Prices of Non-Standard Services of “EPS Distribucija” ... >> Details
6.7.2016 - Adopted Amendments to Methodology for Setting Natural Gas Transmission Use-of-System Charge ... >> Details
1.7.2016 - Acknowledgment to Serbian Energy Agency Expert ... >> Details
23.6.2016 - Lower Crude Oil Transport Charges ... >> Details
16.6.2016 - Public Consultation – Final Customer’s Right to Access to Self-Consumption of Electricity and Natural Gas ... >> Details
10.6.2016 - Approval of Compliance Programme of the Distribution System Operator “EPS Distribucija” ... >> Details
26.2.2016 - Public Consultation on Draft Rulebook on Proceedings, Imposition of Measures and Register of Imposed Measures ... >> Details
17.2.2016 - SEEPEX Launched Serbian Day-Ahead Market Successfully ... >> Details
29.1.2016 - Public Consultation on Methodology for Setting Costs of Connection to Natural Gas Transmission and Distribution Systems ... >> Details
Archive ... >>


Copyright © by Energy Agency of the Republic of Serbia